A true work of art, this world-class 62,850 seat capacity stadium features a retractable pitch, shifting the space from a traditional football look to an American football field to a concert arena in less than half an hour. This award-winning structure also has innovation and sustainability accolades, being powered by 100% renewable energy and committing to zero waste to landfill and single-waste plastic reduction policies.
Our temporary works design team delivered temporary works design solutions to Morrisroe for the construction of the groundworks, basement and concrete frame on the project, including sequencing and temporary erection stability of over 5,000 precast elements. This project was the innovative first use of PT slabs in the UK on a stadium structure of this scale to significantly reduce column numbers. Our PT team was responsible for design management of the final PT design of 112 PT slab pours on behalf of Morrisroe working in collaboration with Buro Happold and Walsh.